Similarly, MISR is faced with cutting down about 6 minutes of data for each orbit. To mitigate details decline, the MISR science team strategized trimming ascending node data collected near the poles (most, although not all, dayside data are obtained to the descending node when Terra is traveling from north to south). “Near the summertime and win